Services all contractors need since 2010

Refrigeration Estimating - Main

Refrigeration Estimating

❄️ Refrigeration Estimating — Master Index

Modules 1–10 • Self-Study Notes & Built-in Tools

Start Here

Work through the modules in order, or jump to what you need. Use the checkboxes to track progress (saved in your browser).

Overall Progress
0 / 10 complete
⬅ Back to Student Portal

Module 1 — Fundamentals

Scope types, CSI mapping, inclusions/exclusions, bid form structure.

Open

Module 2 — Cycle & Load Basics

BTUH, sensible/latent, TDs, diversity & usage profiles.

Open

Module 3 — Equipment Takeoffs

Condensing units, evaporators, condensers, casework & options.

Open

Module 4 — Piping & Accessories

Suction/liquid/discharge lines, fittings EQ length, oil & valves.

Open

Module 5 — Controls & Valves

EEVs/TXVs, pressure & defrost controls, case controllers, BMS.

Open

Module 6 — Insulation, Hangers & Supports

Vapor barriers, thickness selection, hangers, penetrations.

Open

Module 7 — Refrigerants & Compliance

Refrigerant selection, A2L readiness, EPA 608, recovery/charge.

Open

Module 8 — Labor & Productivity

Crew mixes, brazing vs press, vacuum timing, commissioning hours.

Open

Module 9 — Costing & Assemblies

Assemblies for cases, walk-ins, line sets; quotes; freight & lifts.

Open

Module 10 — Commissioning & Turnover

Pressure test, evacuation, charging, SH/SC targets, O&M.

Open

S.F. Johnson Enterprises — Build. Learn. Preserve.