Module 3 · Acceptance Testing & Commissioning

Prepare, program, and pass lighting controls acceptance. Avoid common field failures.

Acceptance Workflow

  1. Confirm sequence of operations is issued & matches submittals.
  2. Place & wire sensors per plan; label control zones.
  3. Program defaults: time-outs, setpoints, partial-on levels.
  4. Pre-test each space; fix coverage/programming issues.
  5. Schedule certified acceptance tester; accompany test.
  6. Submit signed forms with closeout package.

Common Failures & Fixes

Wrong sensor location
Verify coverage diagrams; adjust to avoid dead zones.
Timeouts too long
Program per code & sequence (e.g., 20 min typical).
Daylight not responding
Re-calibrate setpoints; check channel mapping.

Mini Checklist

  • Certified tester scheduled and scope confirmed.
  • Programming notes printed; tablets ready for live tweaks.
  • As-built markups on hand.