Module 3 · Acceptance Testing & Commissioning
Prepare, program, and pass lighting controls acceptance. Avoid common field failures.
Acceptance Workflow
- Confirm sequence of operations is issued & matches submittals.
- Place & wire sensors per plan; label control zones.
- Program defaults: time-outs, setpoints, partial-on levels.
- Pre-test each space; fix coverage/programming issues.
- Schedule certified acceptance tester; accompany test.
- Submit signed forms with closeout package.
Common Failures & Fixes
Wrong sensor location
Verify coverage diagrams; adjust to avoid dead zones.
Verify coverage diagrams; adjust to avoid dead zones.
Timeouts too long
Program per code & sequence (e.g., 20 min typical).
Program per code & sequence (e.g., 20 min typical).
Daylight not responding
Re-calibrate setpoints; check channel mapping.
Re-calibrate setpoints; check channel mapping.
Mini Checklist
- Certified tester scheduled and scope confirmed.
- Programming notes printed; tablets ready for live tweaks.
- As-built markups on hand.