Services all contractors need since 2010

Utility - Water & Sewer Scope Map

Utility - Water & Sewer Scope Map

Utility — Water/Sewer Add-On Tracks • Scope Map

Utility — Water/Sewer Add-On Tracks

Distribution • Service • Sewer Extensions — Multi-discipline Add-Ons for Civil & Site Trades

ConstructIQ • S.F. Johnson Consulting & Construction Services, LLC

Program Scope Overview

This add-on suite expands the base Civil/Mechanical estimating and field curriculum to include water distribution, sewer collection, and service connections. Each track can operate stand-alone or integrate into division-based estimating classes.

  • Water Distribution Track: focuses on mains, appurtenances, valves, hydrants, and testing.
  • Sewer Collection Track: covers gravity and force mains, manholes, laterals, and lift stations.
  • Service Connection Track: covers tie-ins, service lines, meters, and private utility coordination.

Discipline Alignment

DivisionCSI CategoryTypical Content
33 10 00Water UtilitiesMains, hydrants, valves, thrust blocks, chlorination, testing
33 30 00Sanitary Sewer UtilitiesGravity mains, manholes, force mains, testing, CCTV
33 40 00Storm DrainagePVC/HDPE/RC pipe, catch basins, headwalls, erosion control
33 50 00Fuel / Special Utility SystemsOptional add-on (gas piping, reclaimed, irrigation)

Scope Map by Module

ModuleFocus AreaField / Estimating Deliverables
1Utility Plan Reading & Symbols
Legend interpretation, profiles, callouts, stationing.
Mark-up exercise (as-builts & profiles), symbol ID quiz.
2Water Main Systems
Ductile iron, PVC, HDPE pipe classes, bedding, fittings, thrust restraint.
Pipe schedule & material takeoff, pressure class comparison table.
3Valves, Hydrants & Appurtenances
Installation spacing, joint restraints, testing.
Appurtenance map; loss of head calc (hydrant flow test).
4Sewer Main Construction
Slopes, manholes, drop connections, bedding, infiltration control.
Quantity worksheet for manholes & laterals; slope calc.
5Force Mains & Lift Stations
Materials, surge control, air release valves, bypassing.
Lift station schematic review; pump HP calc drill.
6Service Connections & Tie-Ins
Taps, meters, corporation stops, backflow prevention.
Service layout map; tie-in sequence plan (essay).
7Testing & Commissioning
Hydrostatic, leakage, disinfection, CCTV inspection, as-built survey.
Pressure test sheet; QA/QC checklist template.
8Estimating & Cost Assemblies
Unit pricing, crew rates, production, traffic control, restoration.
Excel or E-Deck estimator build; daily production summary.
9Safety & Regulations
Trenching, confined space, one-call/811, OSHA Subpart P, PPE.
Job hazard analysis form; 811 RFI case study.

Integration Checklist

Link water/sewer estimator sheet to manhour calculator.
Add pipe materials CSV (PVC, DIP, HDPE) to E-Deck database.
Upload field video: “Hydrostatic Test Procedures.”
Insert OSHA Subpart P excerpts in Safety Library.
Attach RFI sample template for 811 coordination.