Trade-Specific Estimating Self-Study Library
A professional estimating library organized by trade and scope, built for contractors who want accurate takeoffs, realistic labor planning (manhours), and a repeatable estimating framework — without live coaching or customization.
Email info@sfjohnsonconsulting.com with:
• Trade (Electrical / Plumbing / HVAC / GC / Specialty)
• Package level (Tier 1, Tier 2, or Tier 3)
• Any individual scope modules (Framing A/S, Painting, Concrete, Tile, etc.)
I’ll reply with your invoice and delivery instructions.
Pick a trade, then choose the depth that matches your goal. Most active contractors start with Tier 2 because it includes quantities and associated labor manhours.
Tier 1 — Quantity Takeoff Fundamentals
Scope review and quantity takeoffs only. Built for confidence and accuracy — no labor manhours and no pricing.
Tier 2 — Takeoffs + Manhour System Most Selected
Complete quantity takeoffs with associated labor manhours tied to quantities. No pricing, no overhead/profit, no bid forms.
Tier 3 — Professional Estimating Playbook (Self-Study)
Comprehensive estimating framework: scope → quantities → labor planning → estimate structure. Still self-study only.
What to email (copy/paste)
Subject: Self-Study Package Request
Trade: ____
Tier: ____ (1 / 2 / 3)
Scope Modules (optional): ____
Name / Company: ____
Best email for delivery: ____
Email: info@sfjohnsonconsulting.com
Self-select in 60 seconds: choose your trade, pick your level, then add a scope module only if you need a targeted gap-fill.
| Trade | Available Levels | Recommended Start |
|---|---|---|
| Electrical | Tier 1 · Tier 2 · Tier 3 | Tier 2 (Takeoffs + Manhours) |
| Plumbing | Tier 1 · Tier 2 · Tier 3 | Tier 2 (Takeoffs + Manhours) |
| HVAC / Mechanical | Tier 1 · Tier 2 · Tier 3 | Tier 2 (Takeoffs + Manhours) |
| General Contracting (and specialty trades) | Tier 1 · Tier 2 · Tier 3 | Tier 1 (new) or Tier 2 (active) |
Targeted self-study modules for specific scopes. Each includes quantity takeoffs + associated labor manhours tied to quantities (no pricing).
| Scope Module | Today-Only | Standard | Includes |
|---|---|---|---|
| Framing (Architectural & Structural Plans) | $147 | $247 | Scope coordination (A/S) + quantities + manhours |
| Painting | $147 | $247 | Surface quantities + labor manhours alignment |
| Tile | $147 | $247 | Floor/wall takeoffs + waste + manhours |
| Concrete | $147 | $247 | Volume takeoffs + labor planning manhours |
| Drywall · Flooring · Roofing · Masonry · Insulation · Site/Demo | $147 | $247 | Quantities + manhours tied to scope |
Email info@sfjohnsonconsulting.com and list the modules you want (example: “Framing A/S + Painting + Concrete”). I’ll invoice your request and send delivery details.
Optional bundle: Any 3 scope modules for $397 (today only) — invoiced together.
Trade-Specific Estimating Self-Study Library
A professional estimating library organized by trade and scope, built for contractors who want accurate takeoffs, realistic labor planning (manhours), and a repeatable estimating framework — without live coaching or customization.
Email info@sfjohnsonconsulting.com with:
• Trade (Electrical / Plumbing / HVAC / GC / Specialty)
• Package level (Tier 1, Tier 2, or Tier 3)
• Any individual scope modules (Framing A/S, Painting, Concrete, Tile, etc.)
I’ll reply with your invoice and delivery instructions.
Pick a trade, then choose the depth that matches your goal. Most active contractors start with Tier 2 because it includes quantities and associated labor manhours.
Tier 1 — Quantity Takeoff Fundamentals
Scope review and quantity takeoffs only. Built for confidence and accuracy — no labor manhours and no pricing.
One-paragraph description: This self-study package is designed for contractors and estimators who want a clear, disciplined approach to understanding scope and quantities. It walks through how to review drawings, identify trade-specific scope, and perform accurate quantity takeoffs without pricing or labor extensions. This package is ideal for those who want to strengthen their takeoff skills, reduce missed scope, and build confidence before moving into labor or full estimating.
Tier 2 — Takeoffs + Manhour System Most Selected
Complete quantity takeoffs with associated labor manhours tied to quantities. No pricing, no overhead/profit, no bid forms.
One-paragraph description: This self-study system covers complete quantity takeoffs with associated labor manhour calculations, providing a structured method for translating scope into realistic production expectations. It is built for contractors who want accurate quantities and labor planning without a full bid or pricing service. This package focuses on scope clarity, unit-based thinking, and labor alignment so you can plan work, evaluate bids, or support your own estimating process with confidence.
Tier 3 — Professional Estimating Playbook (Self-Study)
Comprehensive estimating framework: scope → quantities → labor planning → estimate structure. Still self-study only.
One-paragraph description: This comprehensive self-study playbook provides a full estimating framework for the trade, from scope review and quantity takeoffs through labor planning and estimate structure. It is designed for contractors who want to understand the full estimating process at a professional level, without live coaching or customization. This package emphasizes systems, repeatable methodology, and decision-making so you can apply the process consistently across projects.
What you’ll email to buy (copy/paste)
Send this to request an invoice:
Subject: Self-Study Package Request
Trade: ____
Tier: ____ (1 / 2 / 3)
Scope Modules (optional): ____
Name / Company: ____
Best email for delivery: ____
Email: info@sfjohnsonconsulting.com
Self-select in 60 seconds: choose your trade, pick your level, then add a scope module only if you need a targeted gap-fill.
| Trade | Available Levels | Recommended Start |
|---|---|---|
| Electrical | Tier 1 · Tier 2 · Tier 3 | Tier 2 (Takeoffs + Manhours) |
| Plumbing | Tier 1 · Tier 2 · Tier 3 | Tier 2 (Takeoffs + Manhours) |
| HVAC / Mechanical | Tier 1 · Tier 2 · Tier 3 | Tier 2 (Takeoffs + Manhours) |
| General Contracting (and specialty trades) | Tier 1 · Tier 2 · Tier 3 | Tier 1 (new) or Tier 2 (active) |
| If you want to… | Choose | Includes | Does NOT include |
|---|---|---|---|
| Learn scope + do quantities correctly | Tier 1 | Scope clarity + quantity takeoffs | Manhours, pricing, bid forms |
| Do takeoffs AND plan labor realistically | Tier 2 Most Selected | Quantities + labor manhours tied to quantities | Pricing, OH&P, bid forms |
| Understand full estimating structure | Tier 3 | Framework + repeatable method | Project-specific customization |
Email info@sfjohnsonconsulting.com with your trade + tier selection, and I’ll send an invoice.
Targeted self-study modules for specific scopes. Each includes quantity takeoffs + associated labor manhours tied to quantities (no pricing).
| Scope Module | Today-Only | Standard | Includes |
|---|---|---|---|
| Framing (Architectural & Structural Plans) | $147 | $247 | Scope coordination (A/S) + quantities + manhours |
| Painting | $147 | $247 | Surface quantities + labor manhours alignment |
| Tile | $147 | $247 | Floor/wall takeoffs + waste + manhours |
| Concrete | $147 | $247 | Volume takeoffs + labor planning manhours |
| Drywall · Flooring · Roofing · Masonry · Insulation · Site/Demo | $147 | $247 | Quantities + manhours tied to scope |
Email info@sfjohnsonconsulting.com and list the modules you want (example: “Framing A/S + Painting + Concrete”). I’ll invoice your request and send delivery details.
Optional bundle: Any 3 scope modules for $397 (today only) — invoiced together.