Quick Start (2 minutes)
- Enter Proposal Title, Client, Address, Date, and optional Tax %.
- Per line: Description, Qty, Unit, Material $/Unit, Labor Rate, Unit Mh.
- Calculated cells (Total Material, Total Mh, Total Labor, Line Total) update automatically.
- Need more rows? Click + Line.
- Set footer Overhead % and Profit % to complete pricing.
- Use Print / Save PDF, Export CSV, or Email Summary.
Column Cheat Sheet
- Material $/Unit: EA / LF / HR / LOT, etc.
- Total Material = Qty × $/Unit
- Unit Mh examples: LF of pipe, each fitting/fixture, each cleanout.
- Total Mh = Qty × Unit Mh
- Total Labor = Total Mh × Labor Rate
- Line Total = Material + Labor
Saving, Printing, Emailing
- Autosave – entries persist in this browser.
- Print / PDF – clean client copy via browser dialog.
- Export CSV – download line items + header info.
- Email Summary – opens your mail app with formatted text.
Overhead / Profit Math
- Subtotal = sum of Line Totals
- Overhead = Subtotal × Overhead %
- Profit = (Subtotal + Overhead) × Profit %
- Pre-Tax = Subtotal + Overhead + Profit
- Tax = Pre-Tax × Tax %
- Contract Price = Pre-Tax + Tax
Plumbing Layout Tips
- Group by Underground, Above-Ground Rough, Fixtures/Trim, Specialties, Insulation, Testing.
- Use clear units: LF of pipe, EA of fitting/fixture, SF of insulation.
- Separate allowances for sleeves/core drilling, equipment setting, and startup/testing.
This prints above the line-item tables. Calculated table cells are read-only.
SUB TOTAL (All Sections)
$0.00
OVERHEAD %
%
$0.00
PROFIT %
%
$0.00
PRE-TAX TOTAL
$0.00
TAX %
$0.00
PROPOSED CONTRACT PRICE
$0.00