Quick Start (2 minutes)
- Enter Proposal Title, Client, Address, Date, and optional Tax %.
- Input Description, Qty, Unit, Material $/Unit, Labor Rate, Unit Mh.
- Totals update automatically – no manual math needed.
- Need extra rows? Click + Line.
- Set Overhead % and Profit % in the footer.
- Use Print / Save PDF, Export CSV, or Email Summary.
Column Cheat Sheet
- Material $/Unit = EA / LF / SF / TON etc.
- Total Material = Qty × $/Unit
- Unit Mh = labor hours per unit (e.g. duct LF or each RTU).
- Total Mh = Qty × Unit Mh
- Total Labor = Total Mh × Labor Rate
- Line Total = Material + Labor
Saving, Printing, Emailing
- Autosave – data stays in your browser on this device.
- Print / PDF – clean white layout for client copies.
- Export CSV – download your estimate spreadsheet.
- Email Summary – opens your mail app with formatted text.
Overhead / Profit Math
- Subtotal = sum of Line Totals
- Overhead = Subtotal × Overhead %
- Profit = (Subtotal + Overhead) × Profit %
- Pre-Tax = Subtotal + Overhead + Profit
- Tax = Pre-Tax × Tax %
- Contract Price = Pre-Tax + Tax
HVAC Layout Tips
- Group sections: Ductwork, Equipment, Controls, Piping, Insulation.
- Use clear units: LF duct, EA device, SF insulation.
- Add lines for startup / commissioning / crane time.
This prints above the line-item tables. Calculated table cells are read-only.
Section
| Description | Qty | Unit | Material Cost / Unit | Total Material | Labor Rate ($/hr) | Unit Mh | Total Mh | Total Labor | Line Total | |
|---|---|---|---|---|---|---|---|---|---|---|
Section Subtotal
$0.00
Section
| Description | Qty | Unit | Material Cost / Unit | Total Material | Labor Rate ($/hr) | Unit Mh | Total Mh | Total Labor | Line Total | |
|---|---|---|---|---|---|---|---|---|---|---|
Section Subtotal
$0.00
Section
| Description | Qty | Unit | Material Cost / Unit | Total Material | Labor Rate ($/hr) | Unit Mh | Total Mh | Total Labor | Line Total | |
|---|---|---|---|---|---|---|---|---|---|---|
Section Subtotal
$0.00
Section
| Description | Qty | Unit | Material Cost / Unit | Total Material | Labor Rate ($/hr) | Unit Mh | Total Mh | Total Labor | Line Total | |
|---|---|---|---|---|---|---|---|---|---|---|
Section Subtotal
$0.00
Section
| Description | Qty | Unit | Material Cost / Unit | Total Material | Labor Rate ($/hr) | Unit Mh | Total Mh | Total Labor | Line Total | |
|---|---|---|---|---|---|---|---|---|---|---|
Section Subtotal
$0.00
Section
| Description | Qty | Unit | Material Cost / Unit | Total Material | Labor Rate ($/hr) | Unit Mh | Total Mh | Total Labor | Line Total | |
|---|---|---|---|---|---|---|---|---|---|---|
Section Subtotal
$0.00
SUB TOTAL (All Sections)
$0.00
OVERHEAD %
%
$0.00
PROFIT %
%
$0.00
PRE-TAX TOTAL
$0.00
TAX %
$0.00
PROPOSED CONTRACT PRICE
$0.00