The HVAC Estimator

The HVAC Estimator

The E-Deck HVAC Estimator by S F Johnson Consulting & Construction Services

Jump to Estimator
Quick Start (2 minutes)
  1. Enter Proposal Title, Client, Address, Date, and optional Tax %.
  2. Input Description, Qty, Unit, Material $/Unit, Labor Rate, Unit Mh.
  3. Totals update automatically – no manual math needed.
  4. Need extra rows? Click + Line.
  5. Set Overhead % and Profit % in the footer.
  6. Use Print / Save PDF, Export CSV, or Email Summary.
Column Cheat Sheet
  • Material $/Unit = EA / LF / SF / TON etc.
  • Total Material = Qty × $/Unit
  • Unit Mh = labor hours per unit (e.g. duct LF or each RTU).
  • Total Mh = Qty × Unit Mh
  • Total Labor = Total Mh × Labor Rate
  • Line Total = Material + Labor
Saving, Printing, Emailing
  • Autosave – data stays in your browser on this device.
  • Print / PDF – clean white layout for client copies.
  • Export CSV – download your estimate spreadsheet.
  • Email Summary – opens your mail app with formatted text.
Overhead / Profit Math
  • Subtotal = sum of Line Totals
  • Overhead = Subtotal × Overhead %
  • Profit = (Subtotal + Overhead) × Profit %
  • Pre-Tax = Subtotal + Overhead + Profit
  • Tax = Pre-Tax × Tax %
  • Contract Price = Pre-Tax + Tax
HVAC Layout Tips
  • Group sections: Ductwork, Equipment, Controls, Piping, Insulation.
  • Use clear units: LF duct, EA device, SF insulation.
  • Add lines for startup / commissioning / crane time.
The E-Deck HVAC Estimator — S F Johnson Consulting & Construction Services
Build. Learn. Preserve. — Premium estimating tools for HVAC trades
This prints above the line-item tables. Calculated table cells are read-only.
Section
Description Qty Unit Material Cost / Unit Total Material Labor Rate ($/hr) Unit Mh Total Mh Total Labor Line Total
Section Subtotal
$0.00
Section
DescriptionQtyUnitMaterial Cost / UnitTotal Material Labor Rate ($/hr)Unit MhTotal MhTotal LaborLine Total
Section Subtotal
$0.00
Section
DescriptionQtyUnitMaterial Cost / UnitTotal Material Labor Rate ($/hr)Unit MhTotal MhTotal LaborLine Total
Section Subtotal
$0.00
Section
DescriptionQtyUnitMaterial Cost / UnitTotal Material Labor Rate ($/hr)Unit MhTotal MhTotal LaborLine Total
Section Subtotal
$0.00
Section
DescriptionQtyUnitMaterial Cost / UnitTotal Material Labor Rate ($/hr)Unit MhTotal MhTotal LaborLine Total
Section Subtotal
$0.00
Section
DescriptionQtyUnitMaterial Cost / UnitTotal Material Labor Rate ($/hr)Unit MhTotal MhTotal LaborLine Total
Section Subtotal
$0.00
SUB TOTAL (All Sections)
$0.00
OVERHEAD %
% $0.00
PROFIT %
% $0.00
PRE-TAX TOTAL
$0.00
TAX %
$0.00
PROPOSED CONTRACT PRICE
$0.00
Set Overhead / Profit here to match your footer math.

E-Deck Manhour Finder — HVAC

Choose CategoryTypeSize, enter a quantity, then calculate total manhours. Results stack below.