Services all contractors need since 2010

The Electrical Hub - Package 2

The Electrical Hub Package 2

S.F. Johnson Enterprises • Build. Learn. Preserve. ⭐ MOST SELECTED • Package 2

Electrical Takeoffs + Manhour System

Welcome to your Package 2 hub. This package includes Modules 1–6 only — focused on quantity takeoff plus the manhour workflow and decision-ready labor deliverables using industry-standard reference language.

📚 Modules 1–6 🏪 Small Retail Practice (≤10,000 SF) 📤 QTO Export 📄 One-Page Labor Recap 👥 Crew/Day Guidance 🎓 Certificate After Quiz

How to Use Package 2 (Fast, Repeatable Workflow)

Your Weekly Flow

  • Module 1–2: Plan/spec navigation + scope capture
  • Module 3: Takeoff method + export structure
  • Module 4–5: Manhour logic + productivity/risk factors
  • Module 6: One-page labor recap + crew/day guidance

What You’ll Produce

  • Clean QTO export (review-ready)
  • Labor-hour summary (system-based)
  • One-page labor recap (decision-ready)
  • Crew/day breakdown guidance (planning conversations)
  • Scope notes & assumptions (protection + clarity)
Reminder: This Package 2 hub is intentionally limited to Modules 1–6. Full estimating (Modules 7–10) is Package 3. Upgrade access is handled via the contact page.

Package 2 Modules (Access: 1–6)

Use these in order. Your forward/back buttons inside the modules should stay within Package 2.

1

Module 1 — Introduction to Electrical Estimating (Takeoff + Labor Mindset)

Scope awareness, estimating structure, and how to avoid missing labor drivers from day one.
2

Module 2 — Reading & Understanding Electrical Plans

Symbols, schedules, risers/one-lines, details, and where labor-impact scope hides.
3

Module 3 — Electrical Takeoff Methods + QTO Export

Counts/lengths/assemblies and how to export a clean QTO that supports recap and review.
4

Module 4 — Manhour System Foundations (Industry-Standard Reference Language)

How labor is derived, organized, and protected using NECA/Means-style methodology language.
5

Module 5 — Productivity Factors + Labor Risk Protection

Access, phasing, ceiling conditions, material handling, and how to document labor drivers.
6

Module 6 — One-Page Labor Recap + Crew/Day Guidance

Build a decision-ready recap a PM/GC can understand fast, plus crew/day conversion guidance.
Upgrade to unlock Modules 7–10 (Full Estimating + Bid Packaging):
Package 3 includes pricing, OH/profit, proposal packaging, and bid submission structure.