Services all contractors need since 2010

Electrical Module 10

Electrical Estimating Module 10

๐Ÿง  Module 10: Case Studies & Real-World Applications

Put your knowledge to the test with full project walk-throughs โ€” from bid invite to submission and post-bid review.

ConstructIQ Access: All case studies for this module โ€” including videos, added content, downloadable files, and quizzes โ€” live in ConstructIQ. Log in to view each scenario, watch the guided walk-throughs, and complete the graded quizzes.

๐ŸŽฏ Learning Objectives

  • Read and interpret a complete plan/spec set and build a defensible scope sheet.
  • Perform calibrated digital takeoffs (lighting, power, low-voltage) and export clean QTO.
  • Assemble a compliant estimate and proposal package aligned to bid instructions.
  • Analyze win/loss outcomes to improve pricing strategy, risk handling, and presentation.

๐Ÿ“š Case Study Lineup (in ConstructIQ)

#1 โ€” Core & Shell Office (Mid-rise)

Focus: feeders, switchgear, shell lighting, site power. Includes addendum overlays and long-lead risk.

Deliverables: scope sheet โ€ข QTO CSV โ€ข quote log โ€ข clarifications โ€ข bid form PDF

#2 โ€” Kโ€“12 Renovation (Occupied)

Focus: night work premiums, demo vs. new work layers, fire alarm devices, outage windows.

Deliverables: demo/new takeoff layers โ€ข contingency rationale โ€ข alternates table

#3 โ€” Healthcare TI (Clinic)

Focus: equipment connections, grounding, low-voltage routing, inspection sequencing.

Deliverables: device/fixture audit โ€ข QA/QC checklist โ€ข proposal cover letter
Note: Each case study in ConstructIQ includes a video walk-through, downloadable plan/spec PDFs, and a graded quiz.

โš™๏ธ Capstone Workflow (Follow These Steps)

  1. Set Up โ€” Create project folders; download latest plans/specs; record addenda.
  2. Scope Sheet โ€” Identify drawings/spec sections; summarize inclusions/exclusions; list alternates/allowances.
  3. Calibrate & Takeoff โ€” Layers for Lighting/Power/Low-Voltage; verify calibration on 2+ dims per sheet.
  4. QTO Export โ€” Export CSV with columns: Area, Item, Qty, Unit, Rev/Add, Notes.
  5. Quote Leveling โ€” Log lighting/switchgear/FA quotes; compare scope gaps, lead times, terms.
  6. Estimate Build โ€” DC โ†’ Contingency โ†’ Overhead โ†’ Profit (margin). Keep alternates separate.
  7. Proposal Package โ€” Cover letter, clarifications, bid form, alternates, unit prices, quote log.
  8. Submission & Log โ€” Email/portal as instructed; capture timestamp & confirmation.
  9. Post-Bid Review โ€” Do the quiz, self-assess using the rubric, and document lessons learned.

๐Ÿ“ฆ Deliverables & File Naming

  • Scope Sheet (PDF): YYYY-MM-DD_Scope__V01.pdf
  • QTO Export (CSV): YYYY-MM-DD_QTO__Add##.csv
  • Quote Log (XLSX): YYYY-MM-DD_Quotes_.xlsx
  • Clarifications (PDF): YYYY-MM-DD_Clar_.pdf
  • Bid Form (PDF): YYYY-MM-DD_BidForm_.pdf
  • Proposal (PDF): YYYY-MM-DD_Proposal_.pdf
  • Lessons Learned (DOC/PDF): YYYY-MM-DD_LL_.pdf

๐Ÿงฎ Grading Rubric (100 pts)

Category What We Look For Points
QTO Accuracy Counts/lengths within ยฑ2% of key rooms/areas; calibration proven 40
Compliance Bid form, addenda, alternates & unit prices exactly as instructed 15
Clarity Clean scope sheet; professional clarifications; readable proposal 15
Risk Handling Transparent contingency; long-leads noted; VE/allowances as needed 10
Pricing Structure Correct order: DC โ†’ Cont โ†’ OH โ†’ Profit; alternates separated 15
Professionalism Naming standards; versioning; submission log with timestamp 5
Total 100
Passing benchmark: โ‰ฅ 80 pts. Aim for 90+ for โ€œcommendedโ€ status.

๐Ÿงฐ Mini Tools

โœ… Capstone Progress

Completion: 0%

๐Ÿงฎ Self-Score (Quick Rubric)

Total: 0 / 100
Aim for โ‰ฅ80 before you upload to ConstructIQ.

๐Ÿ“ˆ Win/Loss Analysis โ€” What We Learn

  • Winners: scope-complete, on-time, transparent risk handling, clean alternates, strong vendor coverage.
  • Non-winners: scope gaps (lighting controls/FA devices), incorrect addenda handling, messy unit prices, late submission.
  • Next time: earlier RFQs, better symbol audit, VE options tied to schedule risk, bolder clarifications.

๐Ÿง  Practice & Quiz (in ConstructIQ)

  1. Complete the takeoff and export your QTO CSV.
  2. Assemble the full proposal package and upload your PDFs.
  3. Take the case-study quiz to validate your approach and math.
  4. Submit your lessons learned summary.
Reminder: All case studies, videos, added content, and quizzes are hosted in ConstructIQ.

๐ŸŽฌ Module 10 Video