Civil (C) Plan Set — Comprehensive Essay Test
Complete all responses, then submit to education@sfjohnsonconsulting.com.
Instructor Answer Key — Unlock After Review
1. Boundaries/setbacks drive building location, utilities.
2. Compare existing vs. proposed contours → cut/fill.
3. Count structures; measure pipe sizes/lengths; detention vol.
4. Slopes, invert elevations, vertical conflicts.
5. BMPs staged with grading; protect inlets/streams.
6. Slopes/landings/cross-slope limits set by details.
7. Verify FFE vs. grades; utility corridors; landscape zones.
8. Profiles show cover, vertical alignment, crossings.
9. City/county standards, encroachment permits.
10. Earthwork from contours; utilities plan/profile; paving sections.