Services all contractors need since 2010

M Plan Cheat Page

M Plan Cheat Page

❄️ M-Plan Mechanical (HVAC) Cheat Sheet

Learn to read HVAC symbols, ductwork, airflows, schedules, and equipment callouts.

📋 HVAC Symbols & Notes

  • □ with X: Supply diffuser
  • ○ with arrow: Return grille
  • ΔT: Temperature difference
  • CFM: Cubic Feet per Minute (airflow)
  • VAV: Variable Air Volume box

Test: On mechanical plans, a square with an “X” typically means?




🌬️ Airflow & Ductwork

  • Main ducts bold, branches lighter
  • Arrows show airflow direction
  • Duct sizes labeled (e.g., 18″×12″)

Test: What does “2000 CFM” represent?




⚙️ Equipment Tags

  • AHU-1: Air Handling Unit #1
  • RTU-2: Rooftop Unit #2
  • EF-3: Exhaust Fan #3
  • FCU-4: Fan Coil Unit #4

Test: “RTU-2” on a plan stands for?




📑 Mechanical Schedules

Mechanical schedules list equipment data:

  • AHU-1: 5000 CFM, 10 tons cooling
  • RTU-2: Gas heat, 7.5 tons cooling
  • EF-3: 1500 CFM exhaust

Test: Where do you find airflow, tonnage, and voltage for AHU-1?




🎛️ Thermostats & Controls

  • Thermostats marked with “T” or control symbol
  • Zoning = separate thermostats for areas
  • Controls tied to AHU/RTU operation

Test: What does a “T” symbol in a room usually mean?




📐 Sections & Details

  • Duct transitions shown in enlarged sections
  • Mechanical rooms detailed with equipment pads
  • Roof penetrations & curbs detailed in M-sheets

Test: A bubble “5/M2.1” refers to?




📝 Your Notes & Links