The Electrical Estimator

The Electrical Estimator

The E-Deck Electrical Estimator
by S F Johnson Consulting & Construction Services

Quick Start (2 minutes)
  1. Fill in the Proposal Title, Client, Address, Date, and optional Tax %.
  2. In each section, type your Description, Qty, Unit, Material Cost/Unit, Labor Rate, and Unit Mh.
  3. Calculated cells (Total Material, Total Mh, Total Labor, Line Total) update automatically and are read-only.
  4. Need more lines? Click + Line inside a section. Totals update as you type.
  5. At the bottom, set your Overhead % and Profit % to match company pricing. Contract Price will update instantly.
  6. Use the top buttons: Print/Save PDF, Export CSV, or Email Summary.
Column Cheat Sheet
  • Material Cost / Unit: cost per EA / LF / HR / LOT, etc.
  • Total Material = Qty × Material Cost/Unit.
  • Unit Mh: labor hours per unit.
  • Total Mh = Qty × Unit Mh.
  • Total Labor = Total Mh × Labor Rate ($/hr).
  • Line Total = Total Material + Total Labor.
Saving, Printing, Emailing
  • Autosave: Your inputs save in the browser automatically. Closing the tab won’t lose work on the same device.
  • Print / Save PDF: Uses your browser’s print dialog with clean formatting.
  • Export CSV: Downloads a spreadsheet of all line items and header info.
  • Email Summary: Opens your mail app with a formatted text summary (no server required).
Overhead / Profit & Footer Math
  • SUBTOTAL = sum of all section Line Totals.
  • OVERHEAD = SUBTOTAL × Overhead %.
  • PROFIT = (SUBTOTAL + OVERHEAD) × Profit %.
  • PRE-TAX = SUBTOTAL + OVERHEAD + PROFIT.
  • TAX = PRE-TAX × Sales Tax % (from header).
  • CONTRACT PRICE = PRE-TAX + TAX.
Common Mistakes & Quick Fixes
  • Totals not changing? Make sure Qty, Material Cost/Unit, Labor Rate, and Unit Mh are numbers (no $ signs).
  • Wrong units? Use clear units like EA, LF, HR, LOT.
  • Overhead/Profit blank? Enter your company’s standard % in the footer to get the correct Contract Price.
  • Need more rows? Hit + Line inside the section you’re working in.
  • Start fresh? Use Clear All to wipe local data clean.
Tips for Clean Proposals
  • Keep the Scope/Narrative client-facing: inclusions, exclusions, assumptions, and schedule.
  • Group items by section (Wire & Conduit, Switchgear, Lighting, etc.) for faster review and approval.
  • Use Export CSV to hand off quantities/pricing to accounting or PMs.
The E-Deck Electrical Estimator y S F Johnson Consulting & Construction Services
Build. Learn. Preserve. — Premium estimating tools for Electrical trades
This prints above the line-item tables. Calculated table cells are read-only.
SUB TOTAL (All Sections)
$0.00
OVERHEAD %
% $0.00
PROFIT %
% $0.00
PRE-TAX TOTAL
$0.00
TAX %
$0.00
PROPOSED CONTRACT PRICE
$0.00
Set Overhead / Profit here to match your footer math.

E-Deck Manhour Finder — Electrical

Choose CategoryTypeSize, enter a quantity, then calculate total manhours. Results stack below.