Services all contractors need since 2010

Division 30

Division 30

Division 30: Reserved

Division 30 is a reserved division under CSI MasterFormat. While not currently assigned to a specific scope, it is sometimes used for owner-specific criteria, specialty work, or experimental systems. Learn how to identify when Division 30 is active and how to interpret it in the field or during bidding.

🎥 Study Video

Use this placeholder to explain Division 30’s potential future use or current adaptations on custom projects.

📄 Division 30 Reference Sheet

Download a Division 30 worksheet or placeholder spec format that students can use to write and organize custom sections.

Download Division 30 Template

(Replace with your sample Division 30 content.)

💡 Instructor Insights

  • Division 30 may appear in federal, military, or high-tech projects as a location for experimental scopes.
  • Some consultants use Division 30 to house future upgrades, campus standards, or temporary system specs.
  • Use Division 30 in student exercises to design a spec layout for a fictional trade or a multi-trade package.
  • If used in your spec set, confirm whether it applies to bidding, performance criteria, or post-install testing.

📥 Quiz & Resources

Test your understanding of Division 30’s experimental scopes, placeholders, and coordination processes.

  1. What type of projects commonly use Division 30?
    Answer: Federal, military, high-tech, and research-based projects that require flexible or experimental systems.
  2. How can Division 30 be used in teaching spec writing?
    Answer: As a tool for drafting custom sections or creating practice placeholder specs for fictional trades or multi-trade packages.
  3. What might a Division 30 section contain in a project?
    Answer: Placeholder language for future systems, campus-wide standards, or temporary infrastructure scopes.
  4. Why is it important to verify Division 30's application in a spec?
    Answer: To ensure it’s relevant for bidding, performance criteria, or post-install testing requirements and not overlooked.
  5. How does Division 30 relate to project coordination?
    Answer: It can house coordination notes for experimental systems, tracking upgrades, or future installations not yet defined in other divisions.
View Live Classes
 

Division 30: Experimental Scopes & Custom Specifications

🔹 Key Teaching Points

1️⃣ Where Division 30 Is Commonly Found

  • May appear in federal, military, campus-wide, or R&D facility projects with unique spec needs.
  • Some spec writers use it for pilot projects, technology test beds, or temporary install systems.

2️⃣ Future Upgrades or Owner Standards

  • Division 30 can hold placeholder language for expected technology upgrades or new building system types.
  • Great for campus master plans or phased infrastructure work.

3️⃣ Training Exercise Potential

  • Encourage students to invent a fictional trade and spec format — such as “Division 30: Smart Dust Networks.”
  • Helps develop formatting, section referencing, and spec language skills.

4️⃣ Clarify Bidding or Commissioning Impacts

  • If Division 30 is included in a real spec, verify if it’s part of bid pricing or used for performance criteria only.
  • Could include post-install testing or emerging commissioning procedures.

✅ Wrap-Up Summary

  • Division 30 is flexible and can be a teaching tool, spec sandbox, or staging area for innovation.
  • Always check for references in the TOC or addenda even if no drawings are included.
  • Helps students learn how to draft and interpret specs outside of standard CSI categories.