Division 13: Special Construction
Division 13 addresses systems and structures requiring unique coordination, such as clean rooms, radiation-shielded rooms, modular buildings, detention construction, and pre-engineered structures. Learn how to estimate and plan for highly specialized scopes.
🎥 Study Video
Replace the YouTube link above with your Division 13 study video.
📄 Cheat Sheet
Download our Division 13 cheat sheet for an overview of specialty systems, coordination notes, and estimating tips.
Download Cheat Sheet(Replace this link with your actual PDF.)
💡 Instructor Insights
- Pre-engineered metal buildings may have separate drawing packages — double-check spec coordination.
- Clean rooms and radiation-shielded enclosures require tight coordination with HVAC and electrical trades.
- Watch for vendor-furnished/contractor-installed language — common in this division.
- Special inspections and certifications are usually required for Division 13 scopes.
- Modular and prefabricated units often include shop drawings and performance testing sections.
📥 Quiz & Resources
Test your knowledge of Division 13 – Special Construction. Review answers to stay sharp on specialty coordination.
- What type of buildings are common in Division 13?
Answer: Pre-engineered metal buildings, clean rooms, modular shelters, and more. - What should be checked when equipment is owner-furnished?
Answer: Division 01 for installation responsibilities, handling, and delivery procedures. - What coordination is required for clean rooms or shielded spaces?
Answer: HVAC, filtration, wall finishes, and possibly lead shielding or pressurization. - Why are certifications and special inspections important?
Answer: Projects may require UL, seismic, or third-party inspections — delays can result if missed. - What makes modular installs unique?
Answer: Factory-built structures may need rigging, warranties, power tie-ins, and close coordination.
Division 13: Special Construction
🔹 Key Teaching Points
1️⃣ Pre-Engineered Metal Buildings
- These systems often come with their own drawing package and engineering.
- Double-check that coordination exists between the base drawings and vendor submittals.
2️⃣ Clean Rooms & Shielded Spaces
- Clean rooms, radiation rooms, and special enclosures require HVAC/electrical coordination.
- Specs often call for pressure zones, filtration, and material separation.
3️⃣ Vendor-Furnished, Contractor-Installed
- Division 13 items are commonly purchased by the owner and installed by the contractor.
- Always check Division 01 for delivery and responsibility guidelines.
4️⃣ Special Inspections & Certifications
- Specs may require seismic anchoring, factory certifications, or third-party inspections.
- Missing these can hold up final approvals or occupancy.
5️⃣ Modular & Prefab Installations
- Includes prefab kiosks, shelters, and security booths — often with shop drawings required.
- Check for factory testing, warranty requirements, and power tie-ins.
✅ Wrap-Up Summary
- Division 13 covers specialized, pre-manufactured, or engineered systems.
- Coordination with trades and spec sections is critical for successful install.
- Don’t forget inspection and certification requirements — they’re often buried deep.