HVAC Trade and Mechanical Code Exam Prep Syllabus

HVAC Trade & Mechanical Code Exan Prep Syllabus

HVAC — Trade + Mechanical Code • Exam Prep Syllabus

HVAC — Trade + Mechanical Code • Exam Prep Syllabus

Multi-state mechanical code focus with timed simulators, code citations, and rationales.

ConstructIQ • S.F. Johnson Consulting & Construction Services, LLC

Course Overview

Format: 12 weeks • 36–48 study hours • Self-paced milestones. Coverage aligns with IMC/UMC core topics plus IFGC/IPC intersections and OSHA safety.

Target Score: 75%+
Weekly Time: 3–4 hrs
Mode: Open-Book Code Strategy

Outcomes

  • Navigate IMC/UMC with tabs, index, and rapid code citation skills.
  • Execute duct sizing, ventilation calcs, combustion air, and gas piping sizing.
  • Apply refrigeration and psychrometrics basics; select equipment from load & nameplate data.
  • Document answers with exact code references and pass timed simulators with rationale review.

Blueprint-Weighted Domains

Mechanical Code Core

DomainFocus
General RequirementsDefinitions, approvals, listings, permits/inspections
Ventilation & IAQRate tables, occupancy categories, exhaust systems
Duct SystemsSizing, materials, construction, leakage, insulation
Equipment & AppliancesInstallation clearances, connections, condensate, roof placement
RefrigerationPiping, controls, locations, machinery rooms
Combustion Air/ChimneysConfined space calcs, venting, terminations
Fuel Gas (IFGC)Piping sizing, pressure drop, regulators, CSST bonding
Hydronics/BoilersLow-pressure steam/hot water, relief, expansion, separation
Fire/Smoke ProtectionDampers, shafts, penetrations, plenum rules

Trade Math & Safety

DomainFocus
Load & AirflowManual J/S/N overview, CFM, Td, ESP, fan laws
PsychrometricsSensible/latent heat, SHR, coils, Δh, grains
Controls & CommissioningEconomizers, safeties, test/adjust/balance
OSHA & SafetyLadders, fall protection, lockout/tagout, refrigerant handling

Verify your jurisdiction’s adopted code edition and amendments before testing.

Required / Open-Book References

  • IMC (International Mechanical Code), current adopted
  • UMC (Uniform Mechanical Code), where applicable
  • IFGC (Fuel Gas) & IPC excerpts
  • ASHRAE 62.1/62.2 ventilation tables (if allowed)
  • Manufacturer data (fans, coils, RTUs, boilers)
  • Refrigeration handbook & pressure-temp charts
  • OSHA 29 CFR 1926 + 1910 (LOTO & PPE)
  • TAB/commissioning checklists

Swap these chips with your bookstore/PDF links when ready.

12-Week Study Plan & Milestones

WeekFocus & ReadingsDeliverablesHours
1 Orientation & Code Navigation. Tabs/index methods; definitions & admin chapters; permits/inspections.
Create tab map + index drill (10 items).
MCQ (10Q) — admin/definitions.
3–4
2 Ventilation & IAQ. Occupancy tables, exceptions, transfer air, toilet/kitchen exhaust.
Calc Sheet #1 — minimum OA CFM by space type.
MCQ (15Q) — ventilation table lookups.
3–4
3 Duct Systems. Friction rate, equivalent length, fittings, construction, leakage testing.
Calc Sheet #2 — duct size from CFM/ESP.
MCQ (15Q) — construction/insulation rules.
3–4
4 Equipment & Appliances. Clearances, roof/attic installs, condensate, pan protection, electrical coordination.
MCQ (15Q) — install scenarios & citations.
3
5 Refrigeration I. Cycle basics, P-T charts, superheat/subcooling, piping practices, traps, oil management.
Calc Sheet #3 — superheat/subcooling.
MCQ (15Q) — piping & accessories.
3–4
6 Refrigeration II & Machinery Rooms. Location limits, refrigerant classification, ventilation/emergency controls.
MCQ (15Q) — machinery room provisions.
3
7 Combustion Air & Venting. Confined space calcs, horizontal/vertical terminations, Category appliances.
Calc Sheet #4 — combustion air sizing.
MCQ (15Q) — venting rules & clearances.
3–4
8 Fuel Gas (IFGC). Piping sizing (low pressure), pressure drop, regulator locations, CSST bonding.
Calc Sheet #5 — gas line sizing path.
MCQ (15Q) — regulator & bonding rules.
3–4
9 Hydronics & Boilers. Relief valves, expansion tanks, separators, controls, low-pressure steam basics.
MCQ (15Q) — hydronic protection devices.
3
10 Fire/Smoke Protection. Dampers, shafts, penetrations, plenums; smoke control interfaces.
MCQ (15Q) — damper placement/certification.
3
11 Controls, TAB & Commissioning. Economizer logic, safeties, balance reports, startup checklists. OSHA highlights.
Essay (300–500 words): Commissioning plan w/ code cites.
MCQ (10Q) — controls & safeties.
3–4
12 Final Review & Timed Simulator. Mixed domains; citation practice; weak-area recovery plan.
Mixed Simulator (80–100Q) — target ≥75%.
Tab map verification + formula sheet.
3–4

Assignment Types & Readiness Bands

Assignments

  • MCQ Drills (PSI-style): Immediate review with rationales; include article/section citations.
  • Calculation Sheets: Ventilation, duct, combustion air, gas piping, refrigeration.
  • Open-Book Lookups: 10-item index hunts; record exact section/page/tab.
  • Essay: Commissioning or ventilation compliance memorandum (rubric-scored in your Studio).

Readiness Bands (self-scored)

BandRangeMeaning
Ready80–100%Strong simulator performance; accurate citations.
Close70–79%Re-work weak domains; tighten lookup speed.
Needs Work<70%Rebuild tab map; repeat calc drills and rationales.

Exam Tips & Open-Book Strategy

  • First pass: ~45–60 sec/Question. Answer easy, flag hard. Second pass = code lookups.
  • Citations win: Write the exact section for every rationale during practice.
  • Calc hygiene: Label each step (e.g., OA = Rp·Pz + Ra·Az; duct: CFM↔velocity↔area).
  • When unsure: Choose the most conservative, code-compliant control.
  • Edition control: Match your practice to the adopted IMC/UMC year and local amendments.