Demo Estimate Sample

Demo Estimate Sample

Demo Contractor • Full Estimate

🧾 Complete Estimate — Annotated Walkthrough

This demo shows every part of a professional estimate: scope, takeoff recap, labor/material costs, OH/Profit/Contingency, alternates, unit prices, quotes, clarifications, and submission checks.

📌 Project Snapshot i

Identify the job and bid context. The goal is traceability: who/what/where/when.
Project
Client / GC
Location
Bid Due

👥 Contacts

Estimator
Email
Phone

🧭 Scope Summary i

Write what you’re furnishing/installing. This becomes the baseline for clarifications and COs.

✅ Inclusions / 🚫 Exclusions i

Green lists protect your scope; red lists protect your margin. Keep both consistent across bids.
InclusionsExclusions
  • Permits, inspections coordination
  • Submittals, shop drawings, closeout docs
  • Daily cleanup & haul-off
  • Warranty per spec
  • Hazardous abatement
  • IT/AV beyond rough-in
  • OFI (owner-furnished items), unless noted
Tip: If the owner requests transparency, move unknowns to allowances instead of padding contingency.

📐 Takeoff Recap (QTO) i

A compact summary of quantities that drive costs. Keep columns consistent for clean imports into pricing.
Area / RoomItemQtyUnitNotes
Open Office2x4 LED troffer84EAType A
Open OfficeBranch receptacles120EAStandard duplex
CorridorEMT 3/4" w/ wire480LFCeiling space
Conf RoomsSwitches (3-way)12EAKeyed
Export Tip: Use columns: Area Item Qty Unit Rev Notes to maintain a defensible audit trail.

💵 Cost Summary & Pricing Stack i

We convert QTO into dollars, then layer risk and company needs in the correct order: DC → Contingency → Overhead → Profit (Margin).
Division / ScopeLabor $Material/Equip $Subtotal $
01 – General Conditions
09 – Finishes (paint, flooring)
26 – Electrical (lighting, power)
23 – Mechanical (minor adj.)
Direct Cost (DC) (auto)
Contingency %
Overhead %
Target Margin %
Sales/Use Tax % (opt.)
Subtotal (DC + Cont)
Break-even (+ OH)
Tax (if applied to DC)
Final Price (w/ Margin)
Profit $

Formula Price = ((DC × (1+Cont)) × (1+OH)) ÷ (1 − Margin) (tax handled per local rules).

🔀 Alternates i

Client-requested options priced separately so they can add/deduct at award without re-estimating.
Alt #DescriptionAdd/Deduct ($)
ALT-1Upgrade lobby wall finish
ALT-2Replace carpet with LVP

📏 Unit Prices i

Pre-negotiated rates for typical adds; speeds change approvals after award.
ItemUnitPrice/UnitNotes
Core drill 4” slabEABusiness hours
Paint wall (2 coats)SFStd color

🧮 Vendor/Sub Quote Leveling i

Normalize scope, lead times, and terms so the “lowest” number isn’t secretly missing work.
ScopeVendor AVendor BNotes / Gaps
Lighting package$82,400 (4 wks)$79,900 (6 wks)B excludes emergency inverters
Flooring$56,200 (2 wks)$54,900 (3 wks)A includes base; B excludes
Decision rule: Choose scope-complete first, then cost and lead time. Record chosen vendor & backup with timestamps.

📝 Clarifications / Assumptions i

Make hidden risks visible. The PM inherits this list—keep it accurate and useful.

🗓️ Bid-Day Checklist i

A last-look QA/QC so the math and scope match the submission package.
  • Totals reconcile to bid form / cover letter
  • Addenda acknowledged; alternates & unit prices listed
  • Quote log time-stamped; chosen vendor & backup noted
  • Numbers match across PDF/Excel/portal entry