Services all contractors need since 2010

A Plan Cheat Sheet

A Plan Cheat Sheet

πŸ›οΈ A-Plan Architectural Cheat Sheet

Symbols, schedules, finishes, ADA, elevations, and more β€” with calculators & self-tests.

πŸ“ Plan Scale & Symbols

Architectural drawings rely on graphic scales and standard symbols:

  • North Arrow: Orientation
  • Section Cut: Circle with arrow β†’ see detail
  • Elevation Mark: Arrowed circle β†’ see exterior elevation
  • Door/Window Tag: Hexagon or circle keyed to schedule

Test: What does a circle with two arrows opposite each other usually represent?




🧱 Wall Types & Assemblies

  • Interior Partition: 2Γ—4 studs, 1/2β€³ GWB both sides
  • Demising Wall: 2Γ—6 studs, 5/8β€³ Type X both sides
  • CMU Wall: 8β€³ block w/ grout, rebar @ 48β€³ OC
  • Exterior Veneer: 2Γ—6 studs + sheathing + brick veneer

Test: What type of wall is often used between tenant spaces?




πŸšͺ Door & Window Schedules

Schedules define size, type, hardware, glazing:

  • Door Tag: D-101 β†’ 3β€²-0β€³ Γ— 7β€²-0β€³, hollow metal
  • Window Tag: W-201 β†’ 4β€² Γ— 5β€² alum. storefront

Test: A door tag "D-105" is found in the plan. Where do you look for its size?




πŸ–ŒοΈ Room Finish Schedules

Typical finish abbreviations:

  • PT-1: Paint type 1 (walls)
  • ACT-1: Acoustic ceiling tile, type 1
  • CT-1: Ceramic tile, type 1
  • RB: Rubber base

Test: In a finish schedule, what does "ACT-1" usually mean?




πŸ“ Elevations & Sections

  • Elevation Symbols: Arrow circles β€” exterior views
  • Section Cuts: Arrows with detail callouts
  • Detail Bubbles: Refers to enlarged construction detail

Test: A bubble with "3/A5.1" means?




β™Ώ ADA & Life Safety

  • Door Clear Width: 32β€³ min
  • Corridor Width: 36β€³ min (44β€³ in assembly)
  • Restroom Turning Radius: 60β€³ circle
  • Exit Signs: Illuminated @ exits

Test: What is the minimum ADA turning radius in restrooms?




πŸ“ Your Notes & Links